Storage solutions case study

Project description

Full office furniture fit-out, comprising five floors of locker units, mail room and IT room storage and breakout workbenches. Items provided included 15 large locker units from 1,600 to 2,600mm, 6 OSC units, mail room storage with pigeonholes and cantilever worktop, and dual height worktops to various areas.

Location

Glasgow

Materials used

  • Corian® solid surfaces
  • Egger® laminate
  • Formica® laminate
  • Parapan® high gloss acrylic
  • Polyrey® laminate
Time spent

Design and survey hours

Workshop hours

Site hours

Parapan® is an extremely durable, high gloss, solid acrylic material, that has a variety of uses. This product is extremely workable and can be thermoformed into curves and machined like wood.

Like what you see?