Work-in-Progress in our Workshops

Work-in-Progress in our Workshops

Currently progressing through manufacture, this Feature Wall is over 6 metres wide and will be an eye-catching feature to a Café Area. We look forward to seeing this once sprayed in-house, and then fully installed on site soon !    ...
From Workshop to Site

From Workshop to Site

Seeing how an item progresses from a 3D model to a PDF drawing, and then through our workshops onto site, is key to our process. Each individual Drawing Number is tracked and logged using industry-standard software across our purpose-built workshop and nationwide...
ISO accreditation achieved

ISO accreditation achieved

In line with our aim for continuous improvement across the business, we have recently been audited, and subsequently awarded the following certifications: ISO 9001:2015 (Quality Management) andISO 14001:2015 (Environmental Management) This further enhances our...
Local Courthouse Fit-out Complete

Local Courthouse Fit-out Complete

We take particular pride to being appointed to local work, and this new Employment Tribunal Court is no exception. Our overall scope of works comprised two phases, with a total of 8 x Hearing Rooms and 4 x Large Scale High Courts as well as Staff Areas, Security...
College Counter in Manufacture

College Counter in Manufacture

Check out this Reception Desk that is currently progressing through manufacture for an Educational Establishment. This is fully clad in Solid Surface with geometric form. This will soon be ready to be dismantled and carefully wrapped and packed, ready to be delivered...