This phased installation in Central London involved bespoke furniture items such as Reception Desks, Bars, Upholstered Seating and Storage items across two high-traffic atrium Reception Areas, a Rooftop Terrace and Basement Changing Rooms. As with any minimalist scheme, the attention to detail and seamless design required our regular co-ordination with the appointed architect and interior designers.
Selecting of materials which were both high-quality and fit for purpose materials was key to delivering this striking end result. Approximately 18,000 square metres of marble were installed across the scheme and the intersection with this from partitions to bespoke joinery to flooring meant that precision was key not just in terms of design but also phasing of installation, all managed by our in-house Project Manager.