Starting in 2021 with a phased installation programme running through to 2022, jcareydesign provided first-fix and second-fix bespoke joinery items across three floors. The above image shows a fitted Seating Booth area involving internal CNC framework, upholstery, glazing, metalwork, and timber cladding.
This scheme required an extensive list of finishes which were all approved by the appointed Interior Designer via sign-off on physical samples and a highly detailed Finishes Schedule compiled by our Senior Lead Designer.
Also provided were three large-scale Ceiling Features which were intensively co-ordinated with lighting, ventilation, sprinklers and fire detection sensors to name just a few factors considered. Other items such as fitted Wall Panelling, Breakout Spaces, Teapoints, Secure Lockers, Post Rooms and Seating Nooks were also included.